close
Download our Mobile App for free With the instant messaging feature, Messaging is now live, start using it now!
All Menu

Machinery Industry / Import Serbia Importers Production Line Set Up Verified Import Request and Trading Ready Business Listings

Import and Production Line Set Up Export Companies and Serbia Import Export Trade Listings and Details

You are viewing Buying Post posts at Production Line Set Up subcategory of Machinery Industry category from Serbia
Filters

FILTER

  • Filter IconMachinery Industry
  • Filter Icon Production Line Set Up
  • Filter IconSerbia
  • Filter IconImport

Preliminary equipment requirements: 1. Production of milk from almonds, hazelnuts, walnuts, and soy 2. Capacity 1400 units / 1h (maximum capacity 10,000 L milk per day for a 1 L product, minimum capacity 5,000 L milk per day for a 1 L product) 3. UHT treatment of milk 4. Based on your offer, what would be the capacity of each machine in the continual working process? 5. Based on your offer, what would be the requirements for the dimensions of the production plant, the warehouse for storing raw materials, packaging, and the finished product?

Support Whatsapp Back to Top