The scope of work covers all the detailed engineering for the entire project, procurement and construction, commissioning and start-up of the gas pipeline system extending from the designated tie-in with the 36" existing Jordan Gas Transmission Pipeline to the fiscal metering at the end user site. The project mainly consists of engineering, procurement and construction of metering station, pipelines, valves, electrical system, communication system, control system, utilities system, building system and other matching facilities for the pipeline system. The Applicants will be evaluated in the following three major areas: Project and Technical Capability Health, Safety and Environment (HSE) and Quality Systems Company Information.