close
Download our Mobile App for free With the instant messaging feature, Messaging is now live, start using it now!
كل القائمة

طلبات الطاقة / باكستان

أنت تشاهد إعلانات شراء بوست في الفئة الطاقة من باكستان

Hydroelectric Power Plant Supply, Installation, Commissioning and Test Running of 2X1.6MW Turbo Generating Sets

I wish to know the companies in Turkey who manufacture Air Intake Cartridge for Gas Turbine of Power Plants and interested to do business in Pakistan through us.

"Design, Supply, Installation, Commissioning and Testing of Vertical Shaft Francis Turbines, 470 MW Generators, Main Inlet and Relief Valves, Generator Transformers, 500 KV SF6 Circuit Breakers, Switch Gear, Control Instrumentation and SCADA Systems and other associated Powerhouse Equipment"

we, spsl, are scheduled to start installation and operation of demonstration units renewable energy technology based solar, wind and combination of two (solar + wind), power generation units in pakistan. lowest possible prices cnf karachi (in us$) is needed to do market ing & sales successfully for the following renewable energy technology based power generation sets, 10 nos complete plants each with complete scope, 10% extra items to cover any faulty parts or installation / commissionin

  • Prev Page
  • 1
  • 2
  • 3
  • 4
  • Next Page
الدعم Whatsapp العودة إلى الأعلى